Search
Close this search box.
TCN to spend $1.57bn for 20,000MW capacity grid from 2021 – MD
– By Jerome Onoja Okojokwu-Idu

       Share 

Facebook
Twitter
LinkedIn
WhatsApp

The Transmission Company of Nigeria (TCN) said it is injecting $1.57 billion into the power transmission infrastructure to raise the electricity grid to 20,000 megawatts (MW) from 2021.

The Managing Director of TCN, Mr Usman Gur Mohammed disclosed this recently when he received the Editor-In-Chief/CEO of Media Trust Limited, publisher of Daily Trust newspaper and other titles, Malam Mannir Dan-Ali in Abuja.

Mohammed said the projects are contained in the Transmission Rehabilitation and Expansion Programme (TREP) of TCN which targets brownfield (expansion) and greenfield (new) power transmission projects meant to move transmission from its current 7,000MW wheeling capacity.

He said the $1.57bn fund was sourced from multilateral donors to install multiple transformers and transmission lines in line with the global standard of N-1 that implies having double equipment in a power station to create redundancy in the case of a fault.

Source: Daily Trust

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Newsletter

Get to read our latest stories right in your email

Show some Love. Share this post

Copyright 2022. All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from Majorwaves Energy Report

Show Buttons
Hide Buttons