Shell Suspends Production at the World’s Largest Floating LNG Facility
Shell-Commissions-Indigenous-Firm-for-Gas-Market-in-Nigeria
Shell-Commissions-Indigenous-Firm-for-Gas-Market-in-Nigeria
– By Chigozie Ikpo

       Share 

Facebook
Twitter
LinkedIn
WhatsApp

Shell Suspends Production at the World’s Largest Floating LNG Facility

World’s largest trader of liquefied natural gas, Shell has halted production at Prelude LNG – the world’s largest floating liquefied natural gas facility offshore Australia – due to a trip, a spokesperson for the supermajor said on recently without giving details when production could resume.

“Production on the Shell-operated Prelude FLNG facility has been temporarily suspended due to a trip,” a spokeswoman for Shell told Reuters.

“We are working methodically through the stages in the restart process with safety and stability foremost in mind,” she added.

Related Posts

 The Prelude floating LNG production facility offshore northwestern Australia has an annual capacity of 3.6 million tons.

Worlds Largest Floating LNG Facility Shells Prelude FLNG
World’s Largest Floating LNG Facility, Shell’s Prelude FLNG

Friday’s incident is the latest issue that Shell has faced at Prelude LNG in the past year. Between July and September last year, production and exports at Prelude LNG were disrupted due to industrial action at the facility as trade unions demanded higher wages.

Trade unions in Australia extended their strike several times between July and September, also extending the period in which the operator Shell was not able to ship LNG from the facility.

Shell exported some LNG cargoes from Prelude during the strike, but production was taking place at reduced rates to match storage capacity amid the disruption of the tanker berthing process for vessels to pick LNG.

After the pay dispute was settled, Shell had to shut down Prelude LNG again at the end of 2022 due to a fire that occurred on December 21. A small fire was detected on board Prelude in a turbine enclosure. While the fire was quickly contained using a hand-held extinguisher, and there were no injuries, production at the facility was shut down again. Prelude LNG resumed output around a month after the incident.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Newsletter

Get to read our latest stories right in your email

Show some Love. Share this post

Copyright 2022. All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from Majorwaves Energy Report

Show Buttons
Hide Buttons