2. 2,026.5 MW was not generated due to unavailability of gas.
3. 60 MW was not generated due to unavailability of transmission infrastructure, while 2,073.6 MW was not generated due to high frequency resulting from unavailability of distribution infrastructure.
4. 0 MW was recorded as losses due to water management
5. The power sector lost an estimated N1,997,000,000 ( One Billion Nine Hundred and Ninety Seven Million Naira) on January 1 2020 due to constraints from insufficient gas supply, distribution infrastructure and transmission infrastructure.
6. The dominant constraint on January 1 2020 was due to high frequency resulting from unavailability of distribution infrastructure – constraining a total of 2,073.6 MW from being available on the grid.
7. Peak Generation attained on January 1 2020 – 4,676.8 MW
8. Peak Average Energy Sent Out ever – 4,557MWH/H (04 April 2019)
9. Peak Generation attained ever – 5,375MW (07 February 2019)