1. On November 25 2018, average energy sent out was 3,898MWh/hour (down by 134.33MWh/h from the previous day)
2. 2,144.2MW was not generated due to unavailability of gas
3. 112.5MW was not generated due to unavailability of transmission infrastructure, while 70MW was not generated due to high frequency resulting from unavailability of distribution infrastructure
4. Nil MW was recorded as losses due to water management
5. The power sector lost an estimated N1,117,000,000 (One Billion One Hundred and Seventeen Million Naira) on November 25 2018 due to insufficient gas supply, distribution infrastructure and transmission infrastructure.
6. The dominant constraint on November 25 2018 was due to unavailability of gas – constraining a total of 2,144.2MW from being available on the grid.
7. Peak Generation attained on November 25, 2018 – 4,318MW
8. Peak Average Energy Sent Out ever – 4,557MWH/H (02 February 2016)
9. Peak Generation attained ever – 5,222MW (18 December 2017)
10. Estimated Amount Lost to Insufficient Gas Supply, Distribution, Transmission & Water Reserves to date in 2018 – N480,885,000,000 (Four Hundred and Eighty Billion Eight Hundred and Eighty Five Million Naira only).