Electricity: GenCos fail to generate 3,666 megawatts due to gas shortage
– By majorwavesen

Follow us on:

Electricity Generation Companies (GenCos) comprising gas-fired and hydro stations said they could not generate 3,666 megawatts of electricity on Monday due to unavailability of gas.

This information was made known  in a daily energy report by the Advisory Power Team, office of the Vice President, a copy of which was obtained in Abuja on Tuesday  .

Similarly, it said that 526.2 megawatts was not generated due to high frequency resulting from unavailability of distribution infrastructure.

The report, however, said that the GenCos released an average of 4,515 MegaWatts/Hour of electricity into the national grid on Monday.

It said that the electricity sent out by the GenCos was up by 148.05 megawatts from the 4,367 released on Sunday .

The report indicated that the power sector lost an estimated N2,012 billion on Monday  due to insufficient gas supply, distribution and transmission infrastructure.

On sector reform/activities, it said that the dominant constraint for Monday was unavailability of gas.

The report said that the peak generation attained on Monday  was 4,972.5  megawatts.

 

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Newsletter

Get to read our latest stories right in your email

Show some Love. Share this post

Copyright 2022. All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from Majorwaves Energy Report

Show Buttons
Hide Buttons