Search
Close this search box.
Current power infrastructure can’t transmit above 4,000mw – Ex-minister
– By Jerome Onoja Okojokwu-Idu

       Share 

Facebook
Twitter
LinkedIn
WhatsApp

The former minister of aviation, Babatunde Omotoba, has revealed that the current infrastructure in the power sector was incapable of transmitting more than 4000 megawatts adding that Nigeria cannot generate 7000 megawatts.

He stated this in Abuja yesterday at the 2018 engineering conference organised by the Nigerian Institution of Civil Engineers (NICE) Abuja chapter with the theme: “Excellence in Engineering Leadership: A Panacea to Economic Development.”

According to him, “If the power transmission is below 2000 megawatts, it collapses and this is why at times in a month, it will collapse up to seven times and the entire nation will be in darkness.”

At the federal ministry of power, works and housing 4th edition retreat for top directors, heads of units and chief executives of agencies and parastatals, the minister, Babatunde Fashola disclosed that Nigeria could generate and transmit over 7000 mega watts.

Source: Leadership

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Newsletter

Get to read our latest stories right in your email

Show some Love. Share this post

Copyright 2022. All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from Majorwaves Energy Report

Show Buttons
Hide Buttons